This gaff cutter is a Hurd fibreglass hull, originally bought for home completion. The present owner found that after extended passages, the water was coming in where it shouldn't. So they called us in, starting a long and happy relationship.

The jobs on this boat were carried out over a couple of winters, so that she was not out of commission during the summer months whilst cruising the western coast and isles of Scotland.

To summarise the work carried out, we replaced the fibreglass covering the deck and coachroof with epoxy and cloth sheathing, redesigned and rebuilt the cockpit, reworked the bilge pump system, fitted a stainless steel shoe to the stem, fitted new deck hardware, serviced the engine and altered the wheeled cradle.

Finally after numerous repairs and modifications, the boat was coated with two-pack paint to the owners colour scheme.

 
 
                             
                             

 

 
  Development by Buzinet Solutions